Y Combinator's first event in India
Industry
AI
Scope of work
Production and Showrunning for a 2 Day Hackathon
Duration
2 Days


Challenge
From Brief to Build in 48 Hours
A large-scale, multi-zone conference needed to be executed and run within 48 hours.
With the brief coming in just two days before the event, the challenge wasn’t just building the environment, it was also preparing to manage a live, dynamic show with multiple moving parts, stakeholders, and audience flows.


Goal
The Execution Standard
To not only deliver a high-quality production, but also ensure the show ran seamlessly in real time.
Execute the design vision with accuracy and speed
Build across zones within a compressed timeline
Orchestrate the show flow without friction
Maintain consistency, control, and responsiveness on-ground


Solution
Turning Plans into Presence
We approached this as both a production sprint and a live show system.
Rapid Production Turnaround
Translated the brief into actionable build plans immediately—locking vendors, materials, and timelines within hours.
Parallel Execution
Simultaneous on-ground builds across zones to meet the 48-hour deadline.
Showrunning & Control
Managed cues, transitions, and on-ground coordination to ensure the event flowed smoothly from start to finish.
Real-Time Decision Making
Stayed adaptive on-site—handling last-minute changes, timing shifts, and live challenges without disruption.
End-to-End Coordination
Bridged production and show flow, ensuring what was built also functioned flawlessly during the event.